Skip to main content
HASI Consulting — Horn of Africa Strategic Initiatives

Sector 02 of 07

Energy

Energy decisions here are made against unreliable supply, high tariffs and thin local maintenance capacity. Our work covers assessment, system design and installation, plus the technical training that keeps a system running.
Who this covers
Generation, distribution and renewable energy systems
Named clients
2 on the clients page
Lead practices
Technical Consultancy · Technology & Systems

The operating context

What is different about energy here

Supply is unreliable, tariffs are high, and the maintenance skills a system depends on are often not available locally. A design that ignores any of those three will underperform whatever the specification says.

Vendor proposals are frequently the only technical document an organization has. An independent read of one, against your actual load and operating conditions, is usually the cheapest useful step available.

We assess, design and install, and we build the operator capability that keeps the system running after handover.

Technicians testing the control cabinet of a ground-mounted solar array

The work

What organizations here ask us for.

The requests on the left; the practices that answer them on the right. Most engagements in this sector combine at least two.

Named clients in this sector

  • TEC — Telesom Electric
  • Somgas

Marks identify the organizations concerned. They do not imply a current endorsement or an active engagement. Client names are as published in the HASI Company Profile 2026.

Questions

Asked in this sector.

Do you sell or represent equipment?
Our technical advisory is intended to be independent of vendors. Where an engagement involves procurement we set out the evaluation criteria and the basis for any recommendation.
Can you review a proposal we have already received?
Yes. An independent review of a vendor proposal against your requirements is a common short engagement.
Energy

Design for the supply you actually have.

Send us the vendor proposal, the load profile or just the problem. An independent technical read is usually the cheapest useful first step.